DNV GL w Polsce

Breadcrumbs

Grid Connected Solar Photovoltaic (GCPV) LSS

Application, design, construction, test and commissioning, operation and maintenance consideration

Kontakt:

Sinead Murray Sinead Murray
Regional Communications Asia-Pacific

Register

Click here
UDOSTĘPNIJ:
DRUKUJ:
Solar grid integration services

Event Information

  • Gdzie:

    Kuala Lumpur, Malaysia

  • Miejsce:

    Boulevard Hotel, Mid Valley

  • Kiedy:
    19 grudnia - 20 grudnia 2016
    Add to calendar 2016/12/19 09:00 2016/12/20 17:30 Grid Connected Solar Photovoltaic (GCPV) LSS Application, design, construction, test and commissioning, operation and maintenance consideration
    https://www.dnvgl.pl/events/grid-connected-solar-photovoltaic-gcpv-lss-80767
    This only adds the event to your calendar, please remember to register for this event.
    Boulevard Hotel, Mid Valley false YYYY/MM/DD akeGphYOczrmtQTfhmEQ22349
  • Opłata:

    Individual RM 2,500/Pax, Group (3 pax and above) RM 2,500/Pax *additional 6% GST applies

This event is being organized by:

DNV GL logo 225x75pxlTOPS logo 500x75pxl

Who should attend?
This course has been specifically designed for electrical engineers who require an overall knowledge of grid connected photovoltaic systems. Regional experts will cover areas in application requirements, engineering design, technical studies, projects construction, testing and commissioning, protection, operation and maintenance. Participants intending to invest in solar PV will find this course appropriate for portfolio building in this green sector.

Through this course you will be able to:

  1. Gain a thorough understanding of the general principles in grid connected solar photovoltaics
  2. Identify the economics of grid connected solar photovoltaic and understand solar geometry technical constraints and parameters
  3. Appreciating the design calculation and technical considerations
  4. Understand power system studies, testing and commissioning requirements
  5. Be aware of operation and maintenance considerations to ensure full life cycle asset health conditions
  6. Understand connection requirements for FIT and non FIT applications in Peninsular Malaysia

To learn more or register please click here.